Send Message
Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
News
Hebei Junke Machinery Technology Co.,Ltd
Home ProductsLebus Sleeve

High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum

China Hebei Junke Machinery Technology Co.,Ltd certification
China Hebei Junke Machinery Technology Co.,Ltd certification
The company has a very mature technology, product quality is impeccable, the details of the deal well, look forward to the next cooperation.

—— Earlina Adamson

The equipment trades completed in March, the winch wire rope drum has been installed, wire rope neatly arranged, the equipment is in good condition.

—— Zhang Zhipeng Singapore

I'm Online Chat Now

High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum

High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum
High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum

Large Image :  High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum

Product Details:
Place of Origin: Shijiazhuang Hebei China
Brand Name: LBS
Certification: CCS
Model Number: LBSS Series
Payment & Shipping Terms:
Minimum Order Quantity: 1 Piece
Price: Negotiable
Packaging Details: Export Standard Wooden Case
Delivery Time: General Order 15-30 Days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 1000 Pieces Per Month
Detailed Product Description
Product Name: Lebus Sleeves Material: Steel And High Polymer
Groove Type: Lebus Grooves Surface Treatment: Spray Zinc Rich Primer
Connection Type: Welded Or Bolted Dia.of Rope: 4~80mm
Layers: 2~20 Layers Grooving Machining: CNC Machining
Brand: LBS Packing: Pallet
Highlight:

High Efficient lebus groove

,

Tower Crane Engineering lebus groove

,

lebus Wire Rope Drum Sleeve

High Efficient Tower Crane Engineering Wire Rope Winch Drum Lebus Sleeve

 

 

Hoist and tower crane scope of application

1, hoist and tower crane in vertical transport machinery in the scope of application can be used together; There's no limit.

2, the scope of application of hoist and tower crane (characteristics) is different

Construction technology is not too complex, components can be zero points of the case, can use winch (such as brick structure). If large components cannot be separated, tower cranes shall be used (such as large steel molds must be used for cast-in-place cement shear wall structure).

Tower crane: large working space, light weight, small section, small wind resistance, high and falling tower safety problems, easy to operate, comfortable. The most important thing is that the operator is convenient, commanding, crystal clear, thus greatly improving the safety line, is the first choice for construction ~

 

Precautions for the use of crane winch

The wire ropes on the crane drum should be arranged neatly. If overlap and oblique winding are found, they should be stopped and rearranged. It is forbidden to pull the wire rope by hand or foot in rotation. The wire rope shall not be completely released, at least three laps shall be reserved.

2, crane wire rope is not allowed to knot, twist, in a pitch break more than 10%, should be replaced.

3. In the crane operation, no one shall cross the wire rope, and the operator shall not leave the hoist after the object (object) is lifted. Objects or cages should be lowered to the ground when resting.

4. In the operation, the driver and signalman should maintain good visibility with the lifting object. The driver and signalman should cooperate closely and obey the unified command of the signal.

5. In case of power failure during crane operation, the power supply should be cut off and the lifting object should be lowered to the ground.

6, work to listen to the signal of the commander, the signal is unknown or may cause accidents

The operation should be suspended and the operation can be continued until the situation is clear.

7. In case of sudden power failure during crane operation, the brake knife should be opened immediately to put down the goods.

8. After the operation is completed, the material tray should be landed and the electric box should be locked.

9, crane wire rope in the process of use and mechanical wear. Spontaneous combustion corrosion of local damage is unavoidable, should be intervals coated with protective oil.

10. Overloading is strictly prohibited. That is, more than the maximum carrying tonnage.

 

Advantage Of The LBS Grroved

This system is still the most effective and perfect method to prolong the life of wire rope. Tests have shown that the use with Wire rope specifications match the rope groove, Lebus drum can prolong the life of wire rope more than 500%.

LBS rope groove makes the load evenly distributed between layers, and the practice proves that it greatly prolongs the life of wire rope. In fact, the test surface can extend wire rope life by more than 500%. Reducing wire rope damage increases safety and reduces machine downtime.

 

Advantage Sleeves

Generally, the tighter the wire rope is, the better it is wound. The wire rope should withstand at least 2% of the breaking load or 10% of the operating load as recommended by LeBus. Of course, for safety factor and wire rope design, must be prepared to withstand the destructive load.

The design and manufacture of folding rope groove drum should meet the special requirements of lifting operation, and the type of rope groove should adapt to the length, diameter and structure type of wire rope. Mechanical design, machining, design software, mechanical engineer, equipment management, welding, hydraulic, casting, sealing.

 

 Introduction

Name:High Efficient Tower Crane Engineering Wire Rope Winch Drum Lebus Sleeve

Materials of the sleeves: Low-carbon steel 20#,16Mn,Q235B,Q355B/D/E

The use the sleeves: Welded or bolted to the smooth drum core of the winch
Rotation direction of the sleeves: Left or Right
Processing equipment: CNC machining center
Working environment: Indoor, outdoor, rain and dust environment
Working altitude: No more than 2000M
Working Temperature: -40~+50 CentigradWelded or bolted to the smooth drum core of the winch
 
Technical parameters and application:

 

No: Wire diameter(mm): Rotation direction Main drum
diameter(mm)
Main drum length(mm) Application
1 8 10 13 Lefthand,Righthand 430 763 The oil workover rig winch,
Towing winch
Tower crane
2 13 18 20 Lefthand,Righthand 623 1144 Engineering winch,
Lifting winch,Crawler crane
3 22 25 26 Lefthand,Righthand 730 1220 Oil workover rig ,
Logging Winch
4 18 22 32 Lefthand,Righthand 670 1240 Drilling Rig Winch,
drawworks
5 28 32 36 40 Lefthand,Righthand 560 630 Rotating Drilling Rig winch,
Lifting equipment
6 26 28 32 45 Lefthand,Righthand 760 1146 1970 1765 Offshore Crane,
Marine crane,Mooring winch

 

High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum 0High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum 1High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum 2

High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum 3High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum 4High Efficient Tower Crane Engineering Lebus Groove Wire Rope Winch Drum 5

Contact Details
Hebei Junke Machinery Technology Co.,Ltd

Contact Person: Wang

Tel: 86+13315131859

Fax: 86-311-80761996

Send your inquiry directly to us (0 / 3000)